Pfister GT26-4YPY Manuel d'utilisateur Page 3

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 17
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 2
ENGLISH
ENGLISH
ENGLISH
7
8
9
10
7 CONTROL BODY INSTALLATION
Hold Base Ring (7A) to Control Body (7B) and place Gasket (7C) under Base
Ring (7A). From above sink, insert Threaded Shank (7D) and Flexible Tubing
(7E) through side hole of sink.
8 SECURING CONTROL BODY
From underneath sink, secure Control Body (8A) by placing Metal Washer (8B)
and threading Long Nut (
7
/16 Hex.) (8C) onto Mounting Post (8D). Make sure
that the bumps on Metal Washer (8B) are facing up. Tighten loosely, make sure
Handle (8E) swings equally in both directions. Firmly hand tighten Long Nut
(8C). Secure Long Nut (8C) not to exceed a 1/4 turn.
Caution: Do not over tighten!
9
GUIDE FLANGE & DISPENSER SHANK INSTALLATION
Insert Hose Guide (9A) through Hose Guide Gasket (9B) and insert Soap
Dispenser Shank (9C) through Foam Gasket (9D) and into the sink holes. If
desired, place a small bead of plumber’s putty to the underside of Flanges (9A &
9C). (Both Guide Flange and Dispenser Shank can be placed in either hole).
10
SECURING HOSE GUIDE & SOAP DISPENSER SHANK
From underneath sink, secure Hose Guide (10A) and Soap Dispenser Shank
(10B) by screwing Plastic Locknuts (10C) and (10D). Thread on Bottle (10E) to
Soap Dispenser Shank (10B). Hand tighten. Caution: do not over tighten!
3
7B
8A
9C
10B
7D
7A
7C
7E
8D
8B
8C
9D
9A
9B
10A
10D
10C
10E
8E
Vue de la page 2
1 2 3 4 5 6 7 8 ... 16 17

Commentaires sur ces manuels

Pas de commentaire